May was eventful. The Ordinals hype alone was something! )
But first things first.
This month we offered to vote for listing on CEX or adding a hashrate. The community chose +3,000 TH/s and we did it.
We took part in the Bitcoin Conference in Miami and met a huge number of like-minded people. It was really cool!
We partnered with iMe and conducted an airdrop with Bitcoin Magazine.
But frankly, the most important thing is that after a lot of work and preparations, we finally updated the Minto website, offering users a new powerful information resource and a convenient dashboard for work!
On top of that, our May report turned out to be the best in 2023:
📈 Numbers
Hypothetical results with 100% uptime:
Mined: 5.6460 BTC (152 757 USD)
Electricity cost: 166 331 USD
Net profit: -13 574 USD
Actual results with 65% uptime:
Mined: 4.6732 BTC (126 659USD)
Electricity cost: 78 744USD
Net profit: 47 915 USD
Well, spring is always inspiring!
We continue to work and move on, stay with Minto!